Scope of work

What we do for a Vizag charging station

  • Site electrical survey, charger mix and capacity planning
  • APEPDCL new connection / load enhancement documentation
  • Transformer, HT and LT infrastructure where required
  • LT panel, ACDB, DCDB, protection and metering
  • AC (7.4 / 11 / 22 kW) and DC fast charger installation (30–240 kW)
  • Power cabling, termination, trays and cable management
  • Earthing, lightning protection and safety clearances
  • Civil foundation, canopy, lighting and signage as required
  • Testing, commissioning and electrical AMC

Get an EV station quote

Tell us the site, available load and charger type you have in mind. We reply with scope and indicative cost.

9494464640kmvresources@gmail.com

Site types

Where we install in Vizag

Highway & city fuel stations

DC fast charging bays on NH-16 corridors, Anandapuram, Sabbavaram and Pendurthi approaches with correct load planning.

Malls, hotels & parking

AC destination charging plus one or two DC bays, with metering and billing-ready electricals in Beach Road, Dwaraka Nagar and Madhurawada.

Fleet & logistics depots

Multi-gun depot charging with load management for e-autos, e-bikes and delivery fleets in Autonagar, Gajuwaka and Duvvada.

Apartments & tech parks

Society and campus charging with sub-metering, protection and safe cable routing across Rushikonda and Madhurawada.

FAQ

EV charging station questions — Visakhapatnam

Do you install EV charging stations in Visakhapatnam?

Yes. Visakhapatnam is our base. We handle EV charging station consulting, electrical EPC, AC and DC charger installation, commissioning and electrical AMC across Vizag city and district.

What does an EV charging station cost in Vizag?

Cost depends on charger type and available power. An AC 7.4/22 kW setup is the lowest cost; DC fast chargers of 30–120 kW need higher sanctioned load, an LT/HT panel setup and sometimes a transformer. We give an itemised CAPEX after the site survey.

Do you get the APEPDCL connection and load sanction?

Yes. We prepare the document set, apply for a new connection or load enhancement under the applicable EV tariff category, and coordinate metering and commissioning with APEPDCL.

Will a private owner get a government subsidy for an EV station?

Usually not for private or captive chargers. Government incentives are aimed at public charging infrastructure and are typically routed through selected agencies or tenders. We check your actual eligibility before you plan on any subsidy.

Do you offer AMC after installation?

Yes. We provide electrical AMC covering panels, protection, earthing checks, charger uptime support and periodic testing.

WhatsAppCall